Skip to content
Open
Show file tree
Hide file tree
Changes from all commits
Commits
File filter

Filter by extension

Filter by extension

Conversations
Failed to load comments.
Loading
Jump to
Jump to file
Failed to load files.
Loading
Diff view
Diff view
2 changes: 1 addition & 1 deletion docs/release_notes.rst
Original file line number Diff line number Diff line change
Expand Up @@ -10,6 +10,7 @@ Release Notes

Upcoming Release
================
* Added Afforestation costs as Carbon Dioxide Removal technology (https://github.com/PyPSA/technology-data/pull/254)

.. .. warning::

Expand All @@ -18,7 +19,6 @@ Upcoming Release

`v0.14.0 <https://github.com/PyPSA/technology-data/releases/tag/v0.14.0>`__ (13th February 2026)
================================================================================================

* Changed currency year from 2020 to 2025 for all cost assumptions using updated Eurostat inflation rates. (https://github.com/PyPSA/technology-data/pull/263)

* Updated electricity transmission and offshore wind connection costs based on latest DEA data (https://ens.dk/en/analyses-and-statistics/technology-data-transport-energy, July 2025).
Expand Down
5 changes: 4 additions & 1 deletion inputs/manual_input.csv
Original file line number Diff line number Diff line change
Expand Up @@ -725,8 +725,11 @@ H2 production biomass gasification CC,VOM,2020,0.46,EUR/MWh_H2,2010,"JRC, 01_JRC
grey methanol synthesis,efficiency,2030,0.569,MWh_MeOH/MWh_gas,2020,"From https://www.sciencedirect.com/science/article/pii/S0016236119311767, table 2, Methanol Synthesis with integrated autothermal reforming. Efficiency is the exergetic efficiency ",
grey methanol synthesis,carbondioxide-output,2030,0.0567742,t_CO2/MWh_gas,2020,"Calculated from the carbon content of gas (0.198 t_CO2/MWh) compared to the carbon content of MeOH (0.2482 t_CO2/MWh)",
grey methanol synthesis,investment,2030,1001188,EUR/MW_MeOH,2020,"Calculated from https://www.irena.org/-/media/Files/IRENA/Agency/Publication/2021/Jan/IRENA_Innovation_Renewable_Methanol_2021.pdf) Table 25 with an exchange rate of 0.8775 EUR/USD and energy content of 5.528 MWh_MeOH/t_MeOH",
Afforestation,lifetime,2025,30,years,-,"https://onlinelibrary.wiley.com/doi/full/10.1111/rec.13515"," general assumption on duration of fast-growth phase for new forests"
Afforestation,FOM,2025,5,%/year,2020,"https://onlinelibrary.wiley.com/doi/epdf/10.1111/rec.13515","recalculated from the maintenance cost for the assumption on the investment"
Afforestation,investment,2025,7749,EUR/ha,2020,"https://onlinelibrary.wiley.com/doi/epdf/10.1111/rec.13515","assumed to be 1/3 of the upper bound for the range of active restoration costs, NOTE: the investment cost is per hectare of new forests"
oil,fuel,2020,21.3,EUR/MWh,2020,"World Bank (2025) Commodity Markets, https://www.worldbank.org/en/research/commodity-markets","average monthly prices, 1 MWh = 0.564 BBL, 0.85 USD/EUR, +5% markup for heavy oil"
oil,fuel,2025,34.2,EUR/MWh,2025,"World Bank (2025) Commodity Markets, https://www.worldbank.org/en/research/commodity-markets","average monthly prices, 1 MWh = 0.564 BBL, 0.836 USD/EUR, +5% markup for heavy oil"
oil,fuel,2030,34.7,EUR/MWh,2021,"ENTSO-E & ENTSOG TYNDP 2024 Scenarios Inputs Commodity Prices, https://2024-data.entsos-tyndp-scenarios.eu/files/scenarios-inputs/Prices.zip, accessed: 2026-02-03.","Based on IEA 2022 (APS) data, 3.6 GJ/MWh, heavy oil, modelled from crude oil price (+5%)"
oil,fuel,2040,33.6,EUR/MWh,2021,"ENTSO-E & ENTSOG TYNDP 2024 Scenarios Inputs Commodity Prices, https://2024-data.entsos-tyndp-scenarios.eu/files/scenarios-inputs/Prices.zip, accessed: 2026-02-03.","Based on IEA 2022 (APS) data, 3.6 GJ/MWh, heavy oil, modelled from crude oil price (+5%)"
oil,fuel,2050,32.5,EUR/MWh,2021,"ENTSO-E & ENTSOG TYNDP 2024 Scenarios Inputs Commodity Prices, https://2024-data.entsos-tyndp-scenarios.eu/files/scenarios-inputs/Prices.zip, accessed: 2026-02-03.","Based on IEA 2022 (APS) data, 3.6 GJ/MWh, heavy oil, modelled from crude oil price (+5%)"
oil,fuel,2050,32.5,EUR/MWh,2021,"ENTSO-E & ENTSOG TYNDP 2024 Scenarios Inputs Commodity Prices, https://2024-data.entsos-tyndp-scenarios.eu/files/scenarios-inputs/Prices.zip, accessed: 2026-02-03.","Based on IEA 2022 (APS) data, 3.6 GJ/MWh, heavy oil, modelled from crude oil price (+5%)"
3 changes: 3 additions & 0 deletions outputs/US/costs_2020.csv
Original file line number Diff line number Diff line change
@@ -1,4 +1,7 @@
technology,parameter,value,unit,source,further description,currency_year,financial_case,scenario
Afforestation,FOM,5.0,%/year,https://onlinelibrary.wiley.com/doi/epdf/10.1111/rec.13515,recalculated from the maintenance cost for the assumption on the investment,2020.0,,
Afforestation,investment,9743.0858,EUR/ha,https://onlinelibrary.wiley.com/doi/epdf/10.1111/rec.13515,"assumed to be 1/3 of the upper bound for the range of active restoration costs, NOTE: the investment cost is per hectare of new forests",2020.0,,
Afforestation,lifetime,30.0,years,https://onlinelibrary.wiley.com/doi/full/10.1111/rec.13515, general assumption on duration of fast-growth phase for new forests,,,
Alkaline electrolyzer large size,FOM,4.0,%/year,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate
Alkaline electrolyzer large size,FOM,4.0,%/year,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate
Alkaline electrolyzer large size,FOM,4.0,%/year,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative
Expand Down
3 changes: 3 additions & 0 deletions outputs/US/costs_2025.csv
Original file line number Diff line number Diff line change
@@ -1,4 +1,7 @@
technology,parameter,value,unit,source,further description,currency_year,financial_case,scenario
Afforestation,FOM,5.0,%/year,https://onlinelibrary.wiley.com/doi/epdf/10.1111/rec.13515,recalculated from the maintenance cost for the assumption on the investment,2020.0,,
Afforestation,investment,9743.0858,EUR/ha,https://onlinelibrary.wiley.com/doi/epdf/10.1111/rec.13515,"assumed to be 1/3 of the upper bound for the range of active restoration costs, NOTE: the investment cost is per hectare of new forests",2020.0,,
Afforestation,lifetime,30.0,years,https://onlinelibrary.wiley.com/doi/full/10.1111/rec.13515, general assumption on duration of fast-growth phase for new forests,,,
Alkaline electrolyzer large size,FOM,4.0,%/year,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate
Alkaline electrolyzer large size,FOM,4.0,%/year,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate
Alkaline electrolyzer large size,FOM,4.0,%/year,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative
Expand Down
3 changes: 3 additions & 0 deletions outputs/US/costs_2030.csv
Original file line number Diff line number Diff line change
@@ -1,4 +1,7 @@
technology,parameter,value,unit,source,further description,currency_year,financial_case,scenario
Afforestation,FOM,5.0,%/year,https://onlinelibrary.wiley.com/doi/epdf/10.1111/rec.13515,recalculated from the maintenance cost for the assumption on the investment,2020.0,,
Afforestation,investment,9743.0858,EUR/ha,https://onlinelibrary.wiley.com/doi/epdf/10.1111/rec.13515,"assumed to be 1/3 of the upper bound for the range of active restoration costs, NOTE: the investment cost is per hectare of new forests",2020.0,,
Afforestation,lifetime,30.0,years,https://onlinelibrary.wiley.com/doi/full/10.1111/rec.13515, general assumption on duration of fast-growth phase for new forests,,,
Alkaline electrolyzer large size,FOM,4.0,%/year,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate
Alkaline electrolyzer large size,FOM,4.0,%/year,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate
Alkaline electrolyzer large size,FOM,4.0,%/year,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative
Expand Down
3 changes: 3 additions & 0 deletions outputs/US/costs_2035.csv
Original file line number Diff line number Diff line change
@@ -1,4 +1,7 @@
technology,parameter,value,unit,source,further description,currency_year,financial_case,scenario
Afforestation,FOM,5.0,%/year,https://onlinelibrary.wiley.com/doi/epdf/10.1111/rec.13515,recalculated from the maintenance cost for the assumption on the investment,2020.0,,
Afforestation,investment,9743.0858,EUR/ha,https://onlinelibrary.wiley.com/doi/epdf/10.1111/rec.13515,"assumed to be 1/3 of the upper bound for the range of active restoration costs, NOTE: the investment cost is per hectare of new forests",2020.0,,
Afforestation,lifetime,30.0,years,https://onlinelibrary.wiley.com/doi/full/10.1111/rec.13515, general assumption on duration of fast-growth phase for new forests,,,
Alkaline electrolyzer large size,FOM,4.0,%/year,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate
Alkaline electrolyzer large size,FOM,4.0,%/year,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate
Alkaline electrolyzer large size,FOM,4.0,%/year,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative
Expand Down
3 changes: 3 additions & 0 deletions outputs/US/costs_2040.csv
Original file line number Diff line number Diff line change
@@ -1,4 +1,7 @@
technology,parameter,value,unit,source,further description,currency_year,financial_case,scenario
Afforestation,FOM,5.0,%/year,https://onlinelibrary.wiley.com/doi/epdf/10.1111/rec.13515,recalculated from the maintenance cost for the assumption on the investment,2020.0,,
Afforestation,investment,9743.0858,EUR/ha,https://onlinelibrary.wiley.com/doi/epdf/10.1111/rec.13515,"assumed to be 1/3 of the upper bound for the range of active restoration costs, NOTE: the investment cost is per hectare of new forests",2020.0,,
Afforestation,lifetime,30.0,years,https://onlinelibrary.wiley.com/doi/full/10.1111/rec.13515, general assumption on duration of fast-growth phase for new forests,,,
Alkaline electrolyzer large size,FOM,4.0,%/year,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate
Alkaline electrolyzer large size,FOM,4.0,%/year,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate
Alkaline electrolyzer large size,FOM,4.0,%/year,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative
Expand Down
3 changes: 3 additions & 0 deletions outputs/US/costs_2045.csv
Original file line number Diff line number Diff line change
@@ -1,4 +1,7 @@
technology,parameter,value,unit,source,further description,currency_year,financial_case,scenario
Afforestation,FOM,5.0,%/year,https://onlinelibrary.wiley.com/doi/epdf/10.1111/rec.13515,recalculated from the maintenance cost for the assumption on the investment,2020.0,,
Afforestation,investment,9743.0858,EUR/ha,https://onlinelibrary.wiley.com/doi/epdf/10.1111/rec.13515,"assumed to be 1/3 of the upper bound for the range of active restoration costs, NOTE: the investment cost is per hectare of new forests",2020.0,,
Afforestation,lifetime,30.0,years,https://onlinelibrary.wiley.com/doi/full/10.1111/rec.13515, general assumption on duration of fast-growth phase for new forests,,,
Alkaline electrolyzer large size,FOM,4.0,%/year,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate
Alkaline electrolyzer large size,FOM,4.0,%/year,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate
Alkaline electrolyzer large size,FOM,4.0,%/year,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative
Expand Down
3 changes: 3 additions & 0 deletions outputs/US/costs_2050.csv
Original file line number Diff line number Diff line change
@@ -1,4 +1,7 @@
technology,parameter,value,unit,source,further description,currency_year,financial_case,scenario
Afforestation,FOM,5.0,%/year,https://onlinelibrary.wiley.com/doi/epdf/10.1111/rec.13515,recalculated from the maintenance cost for the assumption on the investment,2020.0,,
Afforestation,investment,9743.0858,EUR/ha,https://onlinelibrary.wiley.com/doi/epdf/10.1111/rec.13515,"assumed to be 1/3 of the upper bound for the range of active restoration costs, NOTE: the investment cost is per hectare of new forests",2020.0,,
Afforestation,lifetime,30.0,years,https://onlinelibrary.wiley.com/doi/full/10.1111/rec.13515, general assumption on duration of fast-growth phase for new forests,,,
Alkaline electrolyzer large size,FOM,4.0,%/year,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate
Alkaline electrolyzer large size,FOM,4.0,%/year,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate
Alkaline electrolyzer large size,FOM,4.0,%/year,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative
Expand Down
3 changes: 3 additions & 0 deletions outputs/costs_2020.csv
Original file line number Diff line number Diff line change
@@ -1,4 +1,7 @@
technology,parameter,value,unit,source,further description,currency_year
Afforestation,FOM,5.0,%/year,https://onlinelibrary.wiley.com/doi/epdf/10.1111/rec.13515,recalculated from the maintenance cost for the assumption on the investment,2020.0
Afforestation,investment,9743.0858,EUR/ha,https://onlinelibrary.wiley.com/doi/epdf/10.1111/rec.13515,"assumed to be 1/3 of the upper bound for the range of active restoration costs, NOTE: the investment cost is per hectare of new forests",2020.0
Afforestation,lifetime,30.0,years,https://onlinelibrary.wiley.com/doi/full/10.1111/rec.13515, general assumption on duration of fast-growth phase for new forests,
Alkaline electrolyzer large size,FOM,6.4,%/year,"JRC, 01_JRC-EU-TIMES Full model, https://zenodo.org/records/3544900, file `SubRES_15_TECHS_HYDROGEN.xlsx` (SELCH2EC01, H2 Production-Alkaline Electrolyser, large size, centralized) and currency year from file `SubRES_15_TECHS_HYDROGEN.xlsx`, Sheet `INPUT-Data(HP)`",Reference capacity 72 MW,2010.0
Alkaline electrolyzer large size,VOM,0.7799,EUR/MWh_H2,"JRC, 01_JRC-EU-TIMES Full model, https://zenodo.org/records/3544900, file `SubRES_15_TECHS_HYDROGEN.xlsx` (SELCH2EC01, H2 Production-Alkaline Electrolyser, large size, centralized) and currency year from file `SubRES_15_TECHS_HYDROGEN.xlsx`, Sheet `INPUT-Data(HP)`",Reference capacity 72 MW,2010.0
Alkaline electrolyzer large size,electricity-input,1.5,MWh_el/MWh_H2,"JRC, 01_JRC-EU-TIMES Full model, https://zenodo.org/records/3544900, file `SubRES_15_TECHS_HYDROGEN.xlsx` (SELCH2EC01, H2 Production-Alkaline Electrolyser, large size, centralized) and currency year from file `SubRES_15_TECHS_HYDROGEN.xlsx`, Sheet `INPUT-Data(HP)`",Reference capacity 72 MW,
Expand Down
3 changes: 3 additions & 0 deletions outputs/costs_2025.csv
Original file line number Diff line number Diff line change
@@ -1,4 +1,7 @@
technology,parameter,value,unit,source,further description,currency_year
Afforestation,FOM,5.0,%/year,https://onlinelibrary.wiley.com/doi/epdf/10.1111/rec.13515,recalculated from the maintenance cost for the assumption on the investment,2020.0
Afforestation,investment,9743.0858,EUR/ha,https://onlinelibrary.wiley.com/doi/epdf/10.1111/rec.13515,"assumed to be 1/3 of the upper bound for the range of active restoration costs, NOTE: the investment cost is per hectare of new forests",2020.0
Afforestation,lifetime,30.0,years,https://onlinelibrary.wiley.com/doi/full/10.1111/rec.13515, general assumption on duration of fast-growth phase for new forests,
Alkaline electrolyzer large size,FOM,4.6,%/year,"JRC, 01_JRC-EU-TIMES Full model, https://zenodo.org/records/3544900, file `SubRES_15_TECHS_HYDROGEN.xlsx` (SELCH2EC01, H2 Production-Alkaline Electrolyser, large size, centralized) and currency year from file `SubRES_15_TECHS_HYDROGEN.xlsx`, Sheet `INPUT-Data(HP)`",Reference capacity 72 MW,2010.0
Alkaline electrolyzer large size,VOM,0.3033,EUR/MWh_H2,"JRC, 01_JRC-EU-TIMES Full model, https://zenodo.org/records/3544900, file `SubRES_15_TECHS_HYDROGEN.xlsx` (SELCH2EC01, H2 Production-Alkaline Electrolyser, large size, centralized) and currency year from file `SubRES_15_TECHS_HYDROGEN.xlsx`, Sheet `INPUT-Data(HP)`",Reference capacity 72 MW,2010.0
Alkaline electrolyzer large size,electricity-input,1.38,MWh_el/MWh_H2,"JRC, 01_JRC-EU-TIMES Full model, https://zenodo.org/records/3544900, file `SubRES_15_TECHS_HYDROGEN.xlsx` (SELCH2EC01, H2 Production-Alkaline Electrolyser, large size, centralized) and currency year from file `SubRES_15_TECHS_HYDROGEN.xlsx`, Sheet `INPUT-Data(HP)`",Reference capacity 72 MW,
Expand Down
3 changes: 3 additions & 0 deletions outputs/costs_2030.csv
Original file line number Diff line number Diff line change
@@ -1,4 +1,7 @@
technology,parameter,value,unit,source,further description,currency_year
Afforestation,FOM,5.0,%/year,https://onlinelibrary.wiley.com/doi/epdf/10.1111/rec.13515,recalculated from the maintenance cost for the assumption on the investment,2020.0
Afforestation,investment,9743.0858,EUR/ha,https://onlinelibrary.wiley.com/doi/epdf/10.1111/rec.13515,"assumed to be 1/3 of the upper bound for the range of active restoration costs, NOTE: the investment cost is per hectare of new forests",2020.0
Afforestation,lifetime,30.0,years,https://onlinelibrary.wiley.com/doi/full/10.1111/rec.13515, general assumption on duration of fast-growth phase for new forests,
Alkaline electrolyzer large size,FOM,2.8,%/year,"JRC, 01_JRC-EU-TIMES Full model, https://zenodo.org/records/3544900, file `SubRES_15_TECHS_HYDROGEN.xlsx` (SELCH2EC01, H2 Production-Alkaline Electrolyser, large size, centralized) and currency year from file `SubRES_15_TECHS_HYDROGEN.xlsx`, Sheet `INPUT-Data(HP)`",Reference capacity 72 MW,2010.0
Alkaline electrolyzer large size,VOM,0.3033,EUR/MWh_H2,"JRC, 01_JRC-EU-TIMES Full model, https://zenodo.org/records/3544900, file `SubRES_15_TECHS_HYDROGEN.xlsx` (SELCH2EC01, H2 Production-Alkaline Electrolyser, large size, centralized) and currency year from file `SubRES_15_TECHS_HYDROGEN.xlsx`, Sheet `INPUT-Data(HP)`",Reference capacity 72 MW,2010.0
Alkaline electrolyzer large size,electricity-input,1.38,MWh_el/MWh_H2,"JRC, 01_JRC-EU-TIMES Full model, https://zenodo.org/records/3544900, file `SubRES_15_TECHS_HYDROGEN.xlsx` (SELCH2EC01, H2 Production-Alkaline Electrolyser, large size, centralized) and currency year from file `SubRES_15_TECHS_HYDROGEN.xlsx`, Sheet `INPUT-Data(HP)`",Reference capacity 72 MW,
Expand Down
3 changes: 3 additions & 0 deletions outputs/costs_2035.csv
Original file line number Diff line number Diff line change
@@ -1,4 +1,7 @@
technology,parameter,value,unit,source,further description,currency_year
Afforestation,FOM,5.0,%/year,https://onlinelibrary.wiley.com/doi/epdf/10.1111/rec.13515,recalculated from the maintenance cost for the assumption on the investment,2020.0
Afforestation,investment,9743.0858,EUR/ha,https://onlinelibrary.wiley.com/doi/epdf/10.1111/rec.13515,"assumed to be 1/3 of the upper bound for the range of active restoration costs, NOTE: the investment cost is per hectare of new forests",2020.0
Afforestation,lifetime,30.0,years,https://onlinelibrary.wiley.com/doi/full/10.1111/rec.13515, general assumption on duration of fast-growth phase for new forests,
Alkaline electrolyzer large size,FOM,2.8,%/year,"JRC, 01_JRC-EU-TIMES Full model, https://zenodo.org/records/3544900, file `SubRES_15_TECHS_HYDROGEN.xlsx` (SELCH2EC01, H2 Production-Alkaline Electrolyser, large size, centralized) and currency year from file `SubRES_15_TECHS_HYDROGEN.xlsx`, Sheet `INPUT-Data(HP)`",Reference capacity 72 MW,2010.0
Alkaline electrolyzer large size,VOM,0.3033,EUR/MWh_H2,"JRC, 01_JRC-EU-TIMES Full model, https://zenodo.org/records/3544900, file `SubRES_15_TECHS_HYDROGEN.xlsx` (SELCH2EC01, H2 Production-Alkaline Electrolyser, large size, centralized) and currency year from file `SubRES_15_TECHS_HYDROGEN.xlsx`, Sheet `INPUT-Data(HP)`",Reference capacity 72 MW,2010.0
Alkaline electrolyzer large size,electricity-input,1.38,MWh_el/MWh_H2,"JRC, 01_JRC-EU-TIMES Full model, https://zenodo.org/records/3544900, file `SubRES_15_TECHS_HYDROGEN.xlsx` (SELCH2EC01, H2 Production-Alkaline Electrolyser, large size, centralized) and currency year from file `SubRES_15_TECHS_HYDROGEN.xlsx`, Sheet `INPUT-Data(HP)`",Reference capacity 72 MW,
Expand Down
Loading
Loading